Zheng, Y. and Tang, R. (2026) “Quantifying the Throughput–Tail-Latency Trade-off of Continuous Batching and Chunked-Prefill Scheduling under Production LLM Traces: An Empirical Comparison”, Spectrum of Research, 6(2). Available at: https://spectrumofresearch.com/index.php/sr/article/view/58 (Accessed: 29 October 2026).